Heico Fasteners

Metal Supplier

Long View, NC

Heico Fasteners supplies upholstered-furniture fasteners and decorative nails, backed by over 120 years of manufacturing experience.

  • upholstered furniture manufacturers needing decorative nails
  • custom furniture using logo nails or varied nail finishes
  • furniture production requiring metal tack strip, glides, zippers, or webbing

Benco Steel Inc

Metal Supplier

Hickory, NC

BENCO Steel, established in 1960, supplies structural steel and provides CNC fabrication with delivery within approximately 150 miles of Hickory.

  • structural steel and miscellaneous construction materials
  • custom-cut, bent, punched, welded, or painted steel components
  • businesses needing plates, sheets, bars, tubing, pipe, grating, or decking

rapid, just-in-time delivery

Metal Supplier in nearby counties

FAQ

What metal products can I source from a supplier near Catawba?

Benco Steel lists structural angles, channels, I-beams, beams, bars, plates, sheets, tubing, Schedule 40 and 80 pipe, grating, decking, rebar, threaded rod, and wire mesh.

Can a local steel supplier cut or fabricate my order?

Benco Steel lists CNC plasma cutting, sawing, shearing, bending, punching, welding, painting, and CAD fabrication.

Does Benco Steel deliver around Catawba and Hickory?

Benco serves customers within approximately 150 miles east or west of Hickory and says it delivers to most areas at least twice weekly. Orders outside that area may require special arrangements, especially below 45,000 pounds.

Where can furniture manufacturers buy decorative metal fasteners?

Heico Fasteners supplies decorative nails, logo nails, panel nails, metal tack strip, furniture glides, wood screws, zippers, webbing, and sectional connectors for upholstery and furniture production.

Are these suppliers suited to emergency or same-day orders?

Heico specifically advises against using its service for emergency or same-day fastener delivery. Benco lists rapid, just-in-time delivery and twice-weekly deliveries to most areas, but the actual lead time should be confirmed for the material and fabrication required.