East Attachments, Llc

Steel Fabricators

Winston Salem, NC

East Attachments fabricates machine-specific AR400 attachments for 1.5–70-ton excavators in Winston-Salem with a one-year 100% weld warranty.

  • Machine-specific excavator attachment builds
  • Custom buckets requiring confirmed pin geometry
  • Severe-duty digging in punishing ground conditions

Approximate lead time of 10–15 working days after required measurements are confirmed

Winston Steel Llc

Steel Fabricators

Winston Salem, NC

Winston Steel has fabricated miscellaneous steel since 1996, using AWS-certified welders and BIM modeling for fabrication and installation.

  • Commercial and institutional construction projects requiring stairs, railings, gates, ladders, or supports
  • Light structural framing for awnings, canopies, mechanical systems, cooling towers, or curtain walls
  • Projects needing BIM coordination, 3-D modeling, engineering, or design-build support

on-time delivery

Steel Fabricators in nearby counties

FAQ

How is a steel fabrication project priced?

Pricing depends on the steel quantity, design or drawings, fabrication complexity, finishing, delivery, and installation requirements. Neither listed company publishes standard pricing, so a project-specific quote is needed.

What should I look for in a steel fabricator?

For construction work, check whether the fabricator can provide drawings or BIM coordination, certified welders, inspection, and installation if needed. Winston Steel lists AWS-certified welders, Certified Welding Inspectors, BIM modeling, and field erection.

How long does custom steel fabrication take?

East Attachments lists an approximate 10–15 working-day fabrication lead time after machine measurements are confirmed. Winston Steel does not provide a specific duration in the available information.

Can these fabricators handle emergency steel repairs?

Winston Steel specifically advises against emergency or after-hours steel repairs. East Attachments also requires confirmed measurements and lists a planned fabrication lead time, so neither listing indicates emergency service.